Ongoing Projects- Subhadra View
Welcome to Subhadra View!
The project Subhadra view is situated 10mins driveaway from AirPort, 8mins driveaway from Lingaraj Railway Station/Pokhariput DAV School towards Kapil Prasad Road. It is surrounded by many educational institutes with planty of freeair, light and greenery. It is a high land area which is designed as per vaastu.Specification
STRUCTURE:
RCC Framed structure (Ultratech cement, Lafarge, Ambuja).Massionery with cement mortar external 10" walls and internal 5".
STAIRCASE:
Marble/tiles staircase with steel railing.FLOORING:
Superior quality vitrified tile/Marble flooring in all bed rooms.Drawing and dinning, and anti skid ceramic tiles flooring in bath rooms and other utility area.
WINDOWS:
Aluminium with ms grill finished.KITCHEN:
Vertified tiles with green marble/granite top slab.TOILETS:
Ceramic tiles up to 7' height for walls along with highlighter, Synthetic film coated flush shutter/ PVC/ FRP doors and with best quality sanitary ware and fittings.SANITARY:
ISI Mark Piping for water supply and ISI Mark PVC Piping for Sanitary Lines.Pneumatic pumps will be installed for water supply from deep bore well.
WALL FINISHING:
Internal – Smooth Plastered surface.External – Cement mortar plastering.
PAINTING:
Internal – Putty with colour.External – Weather coat paint.
DOORS:
Main Door – Flush door with teak finish.Internal Doors – Flush door.
Amenities
- 24 hr power back up for Common Area.
- 24 hr water supply.
- Swimming pool.
- Club house.
- Society room.
- 24 hr security.
- Jogging track.
- Gymnasium room.
Payment Schedule
Initial booking amount | 10% |
Signing of agreement | 10% |
Within 7 days of completion of basement casting | 8% |
Within 7 days of completion of ground floor casting | 8% |
Within 7 days of completion of 1st floor casting | 8% |
Within 7 days of completion of 2nd floor casting | 8% |
Within 7 days of completion of 3rd floor casting | 8% |
Within 7 days of completion of 4th floor casting | 8% |
Within 7 days of completion of 5th floor casting | 8% |
Within 7 days of completion of 6th floor casting | 8% |
On Completion of brick work | 8% |
On Completion of finishing work | 4% |
On or before registration | 4% |